Guangzhou Junnan Audiovisual Technology Co., Ltd.

Guangzhou Junnan Audiovisual Technology Co., Ltd.

Manufacturer from China
Verified Supplier
2 Years
Home / Products / Projector Lift /

Customized Hidden Recessed Projector Lift Telescopic Ceiling Projection Full Motion Projector Motorized Lift

Contact Now
Guangzhou Junnan Audiovisual Technology Co., Ltd.
Visit Website
City:guangzhou
Country/Region:china
Contact Person:MrZhou
Contact Now

Customized Hidden Recessed Projector Lift Telescopic Ceiling Projection Full Motion Projector Motorized Lift

Ask Latest Price
Video Channel
Brand Name :JUNNAN
Model Number :JN-L150
Certification :CCC,CE,ROHS,ISO
Place of Origin :China
MOQ :1
Price :US$ 500
Payment Terms :L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability :1-20 ≥21Communicative
Delivery Time :7-20
Packaging Details :45CM*40CM*70CM
Height can be customized upon request :yes
Various controls :Remote control, manual control, etc.
Adjustable length :0m - 1.5m
Angle :18-35°
Move or not :yes
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Customized Hidden Recessed Telescopic Ceiling Projection Full Motion Projector Motorized Lift

The ground push rod we produce is durable, good quality, stable lifting, safe and reliable, can be installed on the camera projector, very easy to use.

junnan Projector Lifter parameters

Product Model JN-L150
journey 1.5m (model change accordingly)
Power consumption 100W
Motor Dechang automobile motor (DC)
Weight More than 7KG
Positioning method Electronic positioning (with double protection)
Color High-gloss white (other colors can be customized)
Precision Stretching 1mm , left and right deflection ±1°
Remote Control Distance 50 meters (open)
Adjustment range Angle adjustable ±10°, screw up and down adjustable
Control Interface Wireless remote control, keypad, RS232
Input Voltage 100-240V~50/60Hz
Power Consumption ≤440W (standby ≤0.5W)
weight 13kg/15kg/18kg/21kg/24kg (net weight)
Installation Ceiling lifting
Storage Temperature -20℃~60℃
Operating Temperature -10℃~40℃
Operating Humidity 20%~80%RH
MTBF ≥30000hours

Junnan Projector Lifter Advantages of the factory

  • The company has advanced production lines, the factory covers an area of 5,000 square meters, building area of 3,000 square meters
  • Strict quality control ensures that products meet the highest quality standards.
  • The quality, stability, and durability of the products are rigorously tested to ensure reliable product quality.
  • The product adopts advanced technology application, humanized design, convenient operation mode
  • Strict quality control ensures that products meet the highest quality standards.

Customized Hidden Recessed Projector Lift Telescopic Ceiling Projection Full Motion Projector Motorized Lift

Junnan projector Lifterbe in favor of Lifting Bracket Features Free Lifting Adjustment Applicable to different scenarios,The Top Is Solid And Stable The Tray Is Not Easy To Shake,Lift Function Safe, Strong And Stable,Extra Large Pallet Plenty Of Space,High Strength Steel Plate Safe And Stable,Integrated Die-cast Panel More Versatile,Electric Lift Intelligent Positioning Remote Control/Central Control/Manual Control, Easy And Convenient Operation.We are Advanced Camera Lifter Easy-maintainable,Both wholesale purchase and private customization are available for customers. Extra Wide Cable Inlet Routing Inside The Pole Aluminum Alloy Material,Product selection and designReasonable color and luster Moderate light and durable ,Product selection and designReasonable color and luster Moderate light and durable The material of thecold-pressed plate is heavy and safe and firm.

Product Features

  1. Multiple sets of cross-cut connecting pieces, small height, long expansion and contraction.
  2. Adopting industrial-grade automobile motors with long life and good stability.
  3. High reliability with integrated control board made by German technology.
  4. Battery can be used for emergency lifting in case of power failure
  5. Small size, easy to install, strong structure.

junnan Projector Lifter Installation diagram

FAQ

Where is your factory located?
Re:We are a conference system supplier located in Guangzhou

How far is your factory from the airport?
Re:About 10KM

Do you provide sample? Free or charge?
Re:We charge for samples

What is your term of payment?
Re:TT, Creidt card ,online pay

How many days you need to install the equipment?
Re:The installation time depends on the type and quantity of equipment. The fastest is 1 day, and the longest is three or four days.

Inquiry Cart 0